Skip to content

Energy in DR: first battery storage system

· by Redacción Orgullo Dominicano · 1 min de lectura
Energía en RD: primer sistema de almacenamiento de baterías
Permiso del dueño del sitio

The battery energy storage system

The Minister of Energy and Mines, Joel Santos, announced that the Dominican Republic will have its first battery energy storage project (BESS) by the end of November this year, which will provide 47 megawatts (MW) to the National Interconnected Electric System (SENI). This project is part of the initiatives driven by the Government to strengthen energy supply, especially during peak demand hours, which occur at night from 7:00 to 11:00.

Project objectives

According to the minister, the goal is to achieve at least 800 MW before 2028, with the integration of two more projects before concluding 2026. This will help strengthen the energy supply and provide greater system stability. The minister emphasized that battery storage is part of the elements that contribute to the harmony of the national energy system, which includes generation, transmission, distribution, and regulation.

Investments for the electric distribution system

The minister also announced that the Government has scheduled investments of around US$750 million for the years 2027 and 2028, aimed at strengthening and optimizing the national electric distribution system. This is essential to maintain stability and continuity of long‑term investments and to raise awareness of its importance so that future government administrations continue strengthening the Dominican energy system.

Source credits: deultimominuto.com

Note generated automatically from the sources cited in the text. Found an error? Email us at [email protected] and we'll fix it.

Publicado en: https://orgullodominicano.org/en/energy-in-dr-first-battery-storage-system/